GBIG.org will be retired on March 31, 2026. Please ensure you have saved any materials you wish to retain before that date. Questions? Contact us

Chase Hall

Building

Building Chase Hall

34 Harvard Way, Boston, MA, USA

HBS Chase Hall

Details

Icon-transparency Transparency

This building has an 11 year timeline with 2 green activities.

Timeline

Chase Hall
registered on 04/08/2025
Registered
LEED v4 BD+C NC
HBS Chase Hall
reported on 10/01/2015
Benchmarked
Boston Building Energy Disclosure (2014)

Resources

Building Details

Space Type(s) Higher Ed
CBSA Boston-Cambridge-Quincy, MA-NH
USGBC Chapter Massachusetts Chapter
EPA Region New England
NHCS Urban Rural Classification Large central metro
Utility Provider Boston Edison Co.
site eui kbtusf 105.1
property uses Office, Residence Hall/Dormitory
municipal building No
year built 1926
ghg emissions mtco2e 389.1
ghg intensity kgco2sf 7.7
total site energy kbtu 5,339,445
electricity 21%
gas 0%
steam 79%
water intensity galsf 22.91
Report a Data Problem