561 Main St

Building

Building 561 Main St

Hackberry, LA, USA

Calcasieu Lake Production Barge, M P ERWIN PRODUCTION FACILITY - A & B

Details

Icon-transparency Transparency

This building has a 1 year timeline with 2 green activities.

Timeline

M P ERWIN PRODUCTION FACILITY - A & B
reported on 08/13/2016
GHG Emissions Reported
EPA GHG Reporting Program (2015)
Calcasieu Lake Production Barge
reported on 08/13/2016
GHG Emissions Reported
EPA GHG Reporting Program (2015)

Resources

Building Details

CBSA Lake Charles, LA
USGBC Chapter Louisiana Chapter
EPA Region South Central
NHCS Urban Rural Classification Small metro
ghg quantity reported metric tons co2 0, 12403
Report a Data Problem