GBIG.org will be retired on March 31, 2026. Please ensure you have saved any materials you wish to retain before that date. Questions? Contact us

Duluth International Airport

Building

Building Duluth International Airport

4701 Grinden Drive, Duluth, MN, USA

Fuel Cell Facility, Duluth International Airport Terminal

Details

Icon-transparency Transparency

This building has a 3 year timeline with 3 green activities including a LEED Certified certification.

Timeline

Fuel Cell Facility
awarded on 11/23/2011
Certified
LEED NC 2.2
Duluth International Airport Terminal
registered on 07/07/2009
Registered
LEED NC 2.2
Fuel Cell Facility
registered on 01/23/2009
Registered
LEED NC 2.2

Walk Score®: 22/100

Transit Score®: 0/100

Resources

Building Details

Owner Type(s) Federal Government, Local Government
Space Type(s) Military Base, Office: Mixed Use
CBSA Duluth, MN-WI
USGBC Chapter Minnesota Chapter
EPA Region Great Lakes
NHCS Urban Rural Classification Medium metro
Report a Data Problem