400

Building

Building 400

4175 S Alamo Ave, Davis-Monthan AFB, AZ, USA

DM FY11 AGE Maintnance & Storage 033002, DM FY11 CSAR Infastructure/Central Plan, DM FY10 CSAR Simulator Facility 103001 + 2 more

Details

Icon-transparency Transparency

This building has an 8 year timeline with 7 green activities including LEED Gold and Silver certifications.

Timeline

Repair AMU Davis-Monthan
registered on 10/11/2016
Registered
LEED NC 2009
DM FY10 CSAR Simulator Facility 103001
registered on 06/18/2009
Registered
LEED NC 2.2

Walk Score®: 8/100

Resources

Building Details

Owner Type(s) Federal Government, Government Use: Federal
Space Type(s) Military Base, Other
CBSA Tucson, AZ
USGBC Chapter Arizona Chapter
EPA Region Pacific Southwest
NHCS Urban Rural Classification Medium metro
Report a Data Problem