11 Lemnos St

Building

Building 11 Lemnos St

Shenton Park WA, Australia

Equinix PE3 Stage 1

Details

Icon-transparency Transparency

This building has a 4 year timeline with 2 green activities including a LEED Certified certification.

Timeline

Equinix PE3 Stage 1
awarded on 02/12/2023
Certified
LEED v4 BD+C DC
Equinix PE3 Stage 1
registered on 12/21/2020
Registered
LEED v4 BD+C DC

Walk Score®: 42/100

Resources

Building Details

Owner Type(s) Corporate: Publicly Traded
Space Type(s) Datacenter
Report a Data Problem