4009 Quivira Dr

Building

Building 4009 Quivira Dr

Laredo, TX, USA

Quivira Phase I, Quivira Phase II, Quivira Phase III

Details

Icon-transparency Transparency

This building has a 1 year timeline with 3 green activities.

Timeline

Quivira Phase III
registered on 09/20/2022
Registered
LEED v4 BD+C CS
Quivira Phase II
registered on 09/20/2022
Registered
LEED v4 BD+C CS
Quivira Phase I
registered on 05/10/2022
Registered
LEED v4 BD+C CS

Resources

Building Details

Space Type(s) Warehouse and Distribution
CBSA Laredo, TX
EPA Region South Central
NHCS Urban Rural Classification Small metro
Report a Data Problem