Dubai Design District

Building

Building Dubai Design District

building 3+1A, Dubai, AE, 00000, AE

KERING DUBAI

Details

Icon-transparency Transparency

This building has a 1 year timeline with 2 green activities including a LEED Gold certification.

Timeline

KERING DUBAI
awarded on 08/21/2024
Gold
LEED v4 ID+C CI
KERING DUBAI
registered on 02/20/2024
Registered
LEED v4 ID+C CI

Resources

Building Details

Owner Type(s) Corporate: Privately Held
Space Type(s) Office
Report a Data Problem