3999 8th St SE

Building

Building 3999 8th St SE

Washington, DC, USA

Ferebee-Hope Elem School Modernization, Ferebee-Hope Elementary, KIPP DC Ferebee Hope High School

Details

Icon-transparency Transparency

This building has a 12 year timeline with 6 green activities.

Timeline

KIPP DC Ferebee Hope High School
registered on 08/17/2020
Registered
LEED v4 BD+C SC
Ferebee-Hope Elementary
reported on 01/01/2012
Benchmarked
DC Public Building Benchmarking FY 2012
Ferebee-Hope Elementary
reported on 01/01/2011
Benchmarked
DC Public Building Benchmarking FY 2011
Ferebee-Hope Elementary
reported on 01/01/2010
Benchmarked
DC Public Building Benchmarking FY 2010
Ferebee-Hope Elem School Modernization
registered on 08/24/2009
Registered
LEED for Schools 2007
Ferebee-Hope Elementary
reported on 01/01/2009
Benchmarked
DC Public Building Benchmarking FY 2009

Walk Score®: 46/100

Transit Score®: 0/100

Resources

Building Details

Owner Type(s) Local Government, Non-Profit (that do not fit into ot
Space Type(s) K-12
CBSA Washington-Arlington-Alexandria, DC-VA-MD-WV
USGBC Chapter National Capital Region Chapter
EPA Region Mid-Atlantic
NHCS Urban Rural Classification Large central metro
Utility Provider Potomac Electric Power Co.
owner sector Local Government
energystar score 7, 3, 5, 2
current weather normalized source energy intensity kbtusqft 189.3, 225.2, 213.1, 242.7
electricity use kwh 2,822,671, 2,808,586, 2,909,705, 3,111,001
natural gas use therms 56,929, 112,002, 82,712, 115,173
current total ghg emissions mtco2e 1,666.69, 1,952.87, 1,845.90, 2,115.86
Report a Data Problem