800 Euclid Street Northwest

Building

Building 800 Euclid Street Northwest

Washington, DC, USA

Banneker High School

Details

Icon-transparency Transparency

This building has a 7 year timeline with 6 green activities.

Timeline

Banneker High School
reported on 04/01/2015
Participant
2014 ENERGY STAR National Building Competition
Banneker High School
reported on 04/16/2014
Participant
2013 ENERGY STAR National Building Competition
Banneker High School
reported on 01/01/2012
Benchmarked: Top 25% Source EUI
DC Public Building Benchmarking FY 2012
Banneker High School
reported on 01/01/2011
Benchmarked: Top 25% Source EUI
DC Public Building Benchmarking FY 2011
Banneker High School
reported on 01/01/2010
Benchmarked: Top 25% Source EUI
DC Public Building Benchmarking FY 2010
Banneker High School
reported on 01/01/2009
Benchmarked: Top 25% Source EUI
DC Public Building Benchmarking FY 2009

Walk Score®: 83/100

Transit Score®: 0/100

Resources

Building Details

Space Type(s) Education
CBSA Washington-Arlington-Alexandria, DC-VA-MD-WV
USGBC Chapter National Capital Region Chapter
EPA Region Mid-Atlantic
ASHRAE Climate Zone ASHRAE Climate Zone #4
NHCS Urban Rural Classification Large central metro
Utility Provider Potomac Electric Power Co.
owner sector Local Government
energystar score 87*, 79*, 82*, 73*
current weather normalized source energy intensity kbtusqft 98.2, 117.5, 112.1, 117
electricity use kwh 1,064,475, 1,010,278, 979,119, 863,473
natural gas use therms 52,133, 84,152, 82,792, 98,521
current total ghg emissions mtco2e 791.67, 935.82, 913.53, 941.34
building owner District of Columbia
organization DC DGS
year built 1970, 1939
energy starting weight in kbtusqft 114.1, 129.4
energy final weight in kbtusqft N/A, --
reduction energy use N/A, --
ghg emissions prevented in mtcoe N/A, --
energy cost savings N/A, --
Report a Data Problem