1 Lockheed Boulevard

Building

Building 1 Lockheed Boulevard

Fort Worth, TX, USA

Component Finish Facility - Phase II, Aircraft Final Finish Facility Phase II, Aero - Bldg 200 + 6 more

Details

Icon-transparency Transparency

This building has a 15 year timeline with 26 green activities including a LEED Silver certification.

Timeline

Aero - Building 12 - Energy Star Certified 2024
awarded on 01/01/2024
87
Energy Star Distribution Center
Aero - Building 14 - Energy Star Certified 2024
reported on 01/01/2024
75
Energy Star Non-Refrigerated Warehouse
Aero - Building 12 - Energy Star Certified 2023
awarded on 01/01/2023
88
Energy Star Distribution Center
Aero - Building 14 - Energy Star Certified 2023
reported on 01/01/2023
81
Energy Star Non-Refrigerated Warehouse
Aero - Building 12 - Energy Star Certified 2022
awarded on 08/04/2022
86
Energy Star Distribution Center
Aero - Building 14 - Energy Star Certified 2022
reported on 07/30/2022
79
Energy Star Non-Refrigerated Warehouse
Full Capability Run Stn Bldgs 267/268
registered on 06/29/2022
Registered
LEED NC 2009
U.S. AIR FORCE PLANT 4 LOCKHEED MARTIN AERONAUTICS CO
reported on 08/13/2016
GHG Emissions Reported
EPA GHG Reporting Program (2015)
Aircraft Final Finish Facility Phase II
registered on 07/08/2010
Registered
LEED NC 2009
Component Finish Facility - Phase II
registered on 06/11/2010
Registered
LEED NC 2009

Walk Score®: 13/100

Transit Score®: 0/100

Resources

Building Details

Owner Type(s) Corporate: Privately Held, Corporate: Publicly Traded
Space Type(s) Industrial Manufacturing, Office
CBSA Dallas-Fort Worth-Arlington, TX
USGBC Chapter North Texas Chapter
EPA Region South Central
ASHRAE Climate Zone ASHRAE Climate Zone #3
NHCS Urban Rural Classification Large central metro
Utility Provider Oncor Electric Delivery Co.
Building Type Office
Building Owner U.S. Air Force
Property Manager Lockheed Martin
Label Year(s) 2018, 2009
Rating(s) 93, 81
Year Constructed 1968
Number of Years Certified 8, 3, 2
Certification Years 2009 , 2018 , 2019 , 2020 , 2021 , 2022 , 2023 , 2024, 2022, 2023, 2024, 2023, 2024
Score(s) 81 , 93 , 84 , 87 , 81 , 78 , 81 , 78, 79, 81, 88, 79, 81, 75, 86, 88, 87, 75, 90
Property type Office, Non-Refrigerated Warehouse, Distribution Center
Year constructed 1968, 2002, 1942, 1988
ghg quantity reported metric tons co2 21923
Report a Data Problem